Hide details for FY 2006-07 Capital Construction PrioritizationFY 2006-07 Capital Construction Prioritization
Comm Summary07:38 AM01:30 PMFinal
Bill Summary Final
Moved to place the Department of Corrections Trinidad Correctional Facility Water Utilities project as 27a and Department of Corrections Colorado Territorial Correctional Facility Sanitary Sewer/Storm Distribution Improvements project as 27b on the Senator McElhany priority list (Attachment B). The motion passed on a 6-0 vote.Final
Moved the Senator McElhany priority list (Attachment B) and further moved to place the design phase of the Department of Corrections' 1555 Sherman Street project as priority number 29a on Attachment B. The motion passed on a 6-0 vote.Final
Moved to place the Colorado State University Diagnostic Medicine Center as priority number 10a on the Senator McElhany priority list (Attachment B). The motion passed on a 6-0 vote.Final
Moved to place the Judicial Space Needs Assessment project as priority number 10b on the Senator McElhany priority list (Attachment B). The motion passed on a 5-1 vote.Final
Moved to reduce the FY 2006-07 request amount for the Auraria Higher Education Center Science Building Addition and Renovation project from $7,704,899 to $2,429,100. The motion passed on a 6-0 vote.Final
Moved to place the Pueblo Community College Academic Building/Learning Center project as priority number 27c on the Senator McElhany priority list (Attachment B). The motion failed on a 1-5 vote.Final
Moved to close the priority list to further consideration. The motion failed when substitute motion that the Capital Development Committee meet at 12:30 p.m. for further prioritization of capital projects passed (see below).Final
Move that the Capital Development Committee recess until 12:30 p.m. to continue prioritization of capital projects. The motion passed on a 5-1 vote.Final
Moved to remove from the revised priority list (Attachment C) the University of Colorado at Colorado Springs Science/Engineering Buildings project. The motion failed when substitute motion to allow the project to remain on the priority list pending prioritization of the project by the Colorado Commission on Higher Education passed (see below).Final
Moved a substitute motion to keep University of Colorado Colorado Springs Science/Engineering Buildings project on the priority list, pending approval of the project by the CCHE. The substitute motion passed on a 6-0 vote.Final
On the revised priority list (Attachment C), moved to shift the University of Colorado at Boulder Ekeley Sciences MiddleWing Renovation project from the number 14 spot to the number 19 spot, to shift the Auraria Higher Education Center Science Building Addition and Renovation project from the number 18 spot to the number 14 spot, and to shift the Department of Human Services Colorado State Veterans Center at Homelake Domiciliary Renovation project from the number 19 spot to the number 18 spot. The motion passed on a 6-0 vote.Final
Moved to place the Department of Public Safety Alamosa Troop Office Regional Communications Center project as 27a on the revised priority list (Attachment C), below the Colorado School of Mines Green Center Improvements project. The motion passed on a 6-0 vote.Final
Moved to amend the Senator Windels motion that leaves the University of Colorado at Colorado Springs Science/Engineering Buildings project on the revised priority list (Attachment C) to also keep the Pueblo Community College Academic Building/Learning Center project on the priority list, pending approval and prioritization of the project by the CCHE. The motion was later withdrawn.Final
Moved to place the Fort Lewis College Berndt Hall Reconstruction project in the number 13 priority position on the revised priority list (Attachment C), and further moved to place the Cumbres and Toltec Railroad Track Rehabilitation project as priority number 19a on Attachment C. Senator McElhany moved to sever the Senator Windels motion into two sections, and the chair agreed. The motion to relocate the Cumbres and Toltec project on the priority list failed on a 3-3 vote.Final
The motion to place the Fort Lewis College Berndt Hall Reconstruction project in the number 13b priority position on Attachment C passed on a 6-0 vote.Final
Moved the FY 2006-07 cash-funded projects. The motion passed on a 6-0 vote.Final
Moved to move the Department of Revenue Revenue Integrated Tax Architecture project to position 33a on the revised priority list (Attachment C), after the Department of Personnel New Office Building at 1555 Sherman Street project. The motion passed on a 6-0 vote.Final
Moved to move the Department of Public Safety CCIC Message Switch Replacement project to position number 32b on the revised priority list (Attachment C), ahead of the recently moved Department of Revenue Revenue Integrated Tax Architecture project. The motion passed on a 6-0 vote.Final
Moved to place the Pueblo Community College Academic Building/Learning Center project before the Department of Corrections Denver Reception and Diagnostic Center Expansion/Renovation project, located in the number 31 position on the revised priority list (Attachment C). The motion failed on a 2-4 vote.Final
Moved to move the Department of Revenue RITA project to position 32a on the revised priority list (Attachment C), before the Department of Personnel New Office Building at 1555 Sherman Street project.Final
Moved to refer the Capital Development Committee's FY 2006-07 capital construction priority list to the Joint Budget Committee. The motion passed on a 6-0 vote.Final