1999
SENATE BILL 99196
BY SENATORS Lacy, Owen, and Tanner;
also REPRESENTATIVES Tool, Berry, and Saliman.
CONCERNING SUPPLEMENTAL APPROPRIATIONS TO CAPITAL
CONSTRUCTION.
Be it enacted by the General Assembly of the State
of Colorado:
SECTION 1. Section
16 (1)(a) and (2)(a) of chapter 191, Session Laws of Colorado
1994, as amended by section 26 of chapter 243, Session Laws of
Colorado 1995, are amended to read:
Section 16. Authorization for construction
of facilities by division of youth services in the department
of human services additional appropriations for 199394
and 199495 fiscal years. (1) (a) As
required by section 13 of chapter 1, Session Laws of Colorado
1993, First Extraordinary Session, the general assembly hereby
approves the construction by the division of youth services in
the department of human services of one hundred eight juvenile
detention beds at a facility to be located in Arapahoe county
at a cost of ten million seven hundred fortysix thousand
dollars ($10,746,000), sixty juvenile detention beds at a facility
to be located in the city and county of Denver at a cost of six
million eight hundred nine thousand four hundred dollars ($6,809,400)
SIX MILLION THREE HUNDRED FIFTY THOUSAND NINETY DOLLARS ($6,350,090),
and sixty juvenile detention beds and sixty juvenile commitment
beds at one or more facilities to be located in the northeast
area of the state at a cost of twelve million four hundred thirtysix
thousand three hundred dollars ($12,436,300), with six million
nine hundred twentyfive thousand six hundred dollars ($6,925,600)
of such amount allocated for detention beds and the remaining
five million five hundred ten thousand seven hundred dollars ($5,510,700)
allocated for commitment beds. If a suitable site cannot be found
in the city and county of Denver for the sixtybed facility,
the department of human services shall recommend an alternate
site for the facility in the Denver metropolitan area, and such
recommendation shall be reviewed and approved by the capital development
committee prior to a final decision on the site for such facility.
The department of human services shall recommend the site for
the facility or facilities to be located in the northeast area
of the state, and such recommendation shall be reviewed and approved
by the capital development committee prior to a final decision
on the site for such facility or facilities. The facilities provided
for in this section shall be constructed from moneys appropriated
to the department of human services and allocated to the division
of youth services by section 12 (1) of said chapter 1 and subsection
(2) of this section.
(2) (a) In addition to any other
appropriation made for the fiscal year beginning July 1, 1993,
there is hereby appropriated, out of any moneys in the capital
construction fund created in section 2475302, Colorado
Revised Statutes, not otherwise appropriated, to the department
of human services, for allocation to the division of youth services,
the sum of two million four hundred
ninetytwo thousand dollars ($2,492,000)
TWO MILLION THIRTYTWO THOUSAND SIX HUNDRED NINETY DOLLARS
($2,032,690), to pay the costs which are in excess of the appropriation
from the capital construction fund made in section 12 (1) of chapter
1, Session Laws of Colorado 1993, First Extraordinary Session,
for the purpose of constructing additional juvenile detention
and juvenile commitment beds.
SECTION 2. Part
IV.5 and the affected totals of Part IV.5 of section 1 of chapter
248, Session Laws of Colorado 1993, which amended section 3 of
chapter 340, Session Laws of Colorado 1992, as further amended
by section 3 of chapter 325, Session Laws of Colorado 1996, are
amended BY THE ADDITION OF A NEW FOOTNOTE to read:
Section 3. Capital construction appropriation.
| ||||||||||
$ | $ | $ | $ | $ |
OFFICE OF STATE PLANNING AND BUDGETING | ||||||||||||
Implementation of the Americans with Disabilities | 17,376,942 | 12,255,244 | 5,121,698 | |||||||||
a This amount shall be from various sources of cash funds. | ||||||||||||
TOTALS PART IV.5 | ||||||||||||
(GOVERNOR) | $17,376,942 | $12,255,244 | $5,121,698 |
FOOTNOTES
2a CAPITAL CONSTRUCTION,
OFFICE OF THE GOVERNOR, OFFICE OF STATE PLANNING AND BUDGETING,
IMPLEMENTATION OF THE AMERICANS WITH DISABILITIES ACT (ADA)
THE PROVISIONS OF SECTION 3(1)(a) NOTWITHSTANDING, IT IS THE INTENT
OF THE GENERAL ASSEMBLY THAT THESE FUNDS REMAIN AVAILABLE UNTIL
THE COMPLETION OF THE PROJECT.
SECTION 3. Part
V (7) and the affected totals of section 3 of chapter 283, Session
Laws of Colorado 1995, are amended BY THE ADDITION OF A NEW FOOTNOTE
to read:
Section 3. Capital construction appropriation.
(7)UNIVERSITY OF COLORADO AT BOULDER | |||||||||||||
(B)Capital Construction | |||||||||||||
Engineering Center Health and Safety Upgrade, Phase 3B | 1,709,000 | 1,709,000 | |||||||||||
Integrated Teaching Laboratory at Engineering Center, Phase | 3,020,574 | 3,020,574 | |||||||||||
Imig Music Addition/Macky Basement Renovation, Phase 2 | 1,330,600 | 1,330,600 | |||||||||||
Engineering Center Tenant Finish | 334,000 | 334,000 | a |
||||||||||
Renovation of Cristol Chemistry and Biochemistry Building | 1,396,525 | 1,396,525 | a |
||||||||||
7,790,699 | |||||||||||||
9,457,779 | |||||||||||||
TOTALS PART V | |||||||||||||
(HIGHER EDUCATION) | $109,314,402 | $43,280,941 | $25,500 | $65,170,330 |
$837,631 |
FOOTNOTES
The following statements are referenced to the numbered footnotes
throughout section 3.
1 Capital Construction,
Department of Corrections, Capital Construction Projects, Limon
Correctional Facility, Inmate Assignments The Department
shall not commence construction of a modular building plant without
the approval of the Capital Development Committee and the Joint
Budget Committee that this industry has a viable market.
2 Capital Construction,
Department of Corrections, Capital Construction Projects, Buena
Vista Correctional Facility, Waste Water Treatment Facility
The Department of Corrections is requested to report to the Capital
Development Committee if the estimated cost of this project exceeds
the recommended amount of this line item.
2a CAPITAL CONSTRUCTION,
DEPARTMENT OF HIGHER EDUCATION, UNIVERSITY OF COLORADO AT BOULDER,
CAPITAL CONSTRUCTION, INTEGRATED TEACHING LABORATORY AT ENGINEERING
CENTER, PHASE 2 THE PROVISIONS OF SECTION 3 (1)(a)
NOTWITHSTANDING, IT IS THE INTENT OF THE GENERAL ASSEMBLY THAT
THESE FUNDS REMAIN AVAILABLE UNTIL THE COMPLETION OF THE PROJECT.
3 Capital Construction, Department of Natural Resources, Division of Wildlife, Land Acquisitions It is the intent of the General Assembly that this amount be used for habitat acquisition using a bid process. Great Outdoors Colorado would provide $250,000, with the reserves from the Wildlife Cash Fund providing an additional $500,000. If a bid process for the acquisition of property by the Division is not renewed, these funds shall not be expended.
SECTION 4. Part
VIII (2) and the affected totals of section 3 of chapter 324,
Session Laws of Colorado 1996, as amended by section 1 of chapter
311, Session Laws of Colorado 1997, are amended to read:
Section 3. Capital construction appropriation.
(2)DIVISION OF WILDLIFE | ||||||||||||||||||||||||||
Dam Maintenance Repair and Improvement | 109,730 | 109,730 | a |
|||||||||||||||||||||||
Land Acquisitions | 1,000,000 | 1,000,000 | a |
|||||||||||||||||||||||
Fish Unit Maintenance and Improvement | 1,475,754 | 1,475,754 | a |
|||||||||||||||||||||||
Property Maintenance, Improvement and Development | 1,461,918 | 1,461,918 | a |
|||||||||||||||||||||||
Watchable Wildlife in State Parks | 250,000 | 250,000 | a |
|||||||||||||||||||||||
Waterfowl Habitat Projects | 160,000 | |||||||||||||||||||||||||
160,000 | c |
|||||||||||||||||||||||||
Motorboat Access on Lakes and Streams | 867,000 | 217,000 | a |
650,000 | ||||||||||||||||||||||
Stream and Lake Improvements | 640,328 | 640,328 | a |
|||||||||||||||||||||||
Employee Housing Repairs | 227,720 | 227,720 | a |
|||||||||||||||||||||||
Cooperative Habitat Development | 400,000 | 400,000 | a |
|||||||||||||||||||||||
Miscellaneous Small Projects | 521,873 | 521,873 | a |
|||||||||||||||||||||||
San Luis Valley HatcheryProperty Acquisition | 1,100,000 | 1,100,000 | b |
|||||||||||||||||||||||
8,214,323 | ||||||||||||||||||||||||||
a These amounts shall be from reserves in the Wildlife Cash Fund. | ||||||||||||||||||||||||||
b This amount shall be from reserves in the Wildlife Cash Fund and shall only be expended after approval of the Capital Development Committee. | ||||||||||||||||||||||||||
c This amount shall be from the Duck Stamp Program. | ||||||||||||||||||||||||||
TOTALS PART VIII | ||||||||||||||||||||||||||
(NATURAL RESOURCES) | $17,929,323 | $17,279,323 | $650,000 |
SECTION 5. Part
X (1) and the affected totals of section 3 of chapter 324, Session
Laws of Colorado 1996, are amended to read:
Section 3. Capital construction appropriation.
(1)CAPITAL CONSTRUCTION PROJECTS | |||||||||||||
Water Quality Wastewater Treatment Construction Grants | 3,000,000 | 3,000,000 | |||||||||||
Renovation of Building 1307 at Lowry and Relocation of the Laboratory from UCHSC to Building 1307, Phase 3 | 5,076,294 | 1,150,000 | a | ||||||||||
6,274,026 | 47,732 | ||||||||||||
9,274,026 | |||||||||||||
a This amount shall be from the sale of the old Laboratory Building. | |||||||||||||
TOTALS PART X | |||||||||||||
(PUBLIC HEALTH AND ENVIRONMENT) | $8,076,294 | $1,150,000 | |||||||||||
$9,274,026 | $47,732 | ||||||||||||
GRAND TOTALS | |||||||||||||
(CAPITAL CONSTRUCTION) | $187,922,154 |
$13,652,060 | $111,174,646 | a |
|||||||||
$316,449,626 | $3,700,766 | ||||||||||||
a Of this amount, $2,452,270 contains a (T) notation and $1,923,856 is from the Highway Users Tax Fund pursuant to Section 434201 (3)(a), C.R.S. |
SECTION 6. Part
V (4)(B) and (6), Part IX(2)(A), Part XI (1), Part XII (1), and
the affected totals of section 3 of chapter 310, Session Laws
of Colorado 1997, as amended by section 1 of chapter 337, Session
Laws of Colorado 1998, are amended to read:
Section 3. Capital construction appropriation.
PART V | ||||||||||||||||||||||||||
(4) COLORADO STATE UNIVERSITY | ||||||||||||||||||||||||||
(B) Capital Construction Projects | ||||||||||||||||||||||||||
Expansion and Renovation, Engineering Building, Phase 2 | 7,500,457 | 7,500,457 | ||||||||||||||||||||||||
Purchase of Old Fort Collins High School | 4,300,000 | 4,300,000 | ||||||||||||||||||||||||
Classroom and Instructional Laboratories Renovations | 450,000 | 450,000 | a |
|||||||||||||||||||||||
Bioenvironmental Hazards Research Building, Foothills Research Campus | 5,400,000 | 3,900,000 | a |
1,500,000 | ||||||||||||||||||||||
Cooperative Institute for Research in Atmospheric Sciences Building Addition, Foothills Research Campus | 440,000 | 440,000 | a |
|||||||||||||||||||||||
Visitor Center Building, Environmental Learning Center | 1,374,543 | 268,383 | b |
1,106,160 | d | |||||||||||||||||||||
Relocation of Animal Sciences Program, Phase 1 | 1,837,100 | 1,397,100 | 440,000 | c |
||||||||||||||||||||||
Chlorofluorocarbon Compliance/ Chilled Water Loop Project, Phase 2 | 2,211,500 | 2,211,500 | ||||||||||||||||||||||||
Backflow Prevention System, Campus Buildings, Phase 1 | 241,506 | 241,506 | ||||||||||||||||||||||||
Animal Holding Facility, Veterinary Teaching Hospital | 798,100 | 798,100 | a |
|||||||||||||||||||||||
Renovation of Gibbons Building2a | 400,000 | 400,000 | ||||||||||||||||||||||||
Renovation of Occupational Therapy Building2a | 200,000 | 200,000 | ||||||||||||||||||||||||
Renovation of Johnson Hall2a | 1,400,000 | 1,400,000 | ||||||||||||||||||||||||
Renovation of Student Health Center and Green Hall2a | 550,000 | 550,000 | ||||||||||||||||||||||||
Renovation of South College Gym2a | 150,000 | 150,000 | ||||||||||||||||||||||||
Academic Reconfiguration of Eddy Hall2a | 850,000 | 850,000 | ||||||||||||||||||||||||
Academic Reconfiguration of Education Building2a | 400,000 | 400,000 | ||||||||||||||||||||||||
Improvement of Campus Roads, Streets, Circulation, and Landscaping2a | 286,000 | 286,000 | ||||||||||||||||||||||||
Campuswide Water Mitigation2a | ||||||||||||||||||||||||||
625,000 | 625,000 | |||||||||||||||||||||||||
Site/Buildingspecific Water Mitigation2a | 125,000 | 125,000 | ||||||||||||||||||||||||
29,539,206 | ||||||||||||||||||||||||||
34,784,152 | ||||||||||||||||||||||||||
a These amounts shall come from exempt institutional sources and are shown here for informational purposes only. Therefore, they shall not be accounted for in the State's Capital Construction Fund and the limitations on encumbrance timeliness and use of internal workforce do not apply. | ||||||||||||||||||||||||||
b This amount shall be from the Fort Collins Convention and Visitors Center. | ||||||||||||||||||||||||||
c This amount shall be from the sale of the Rigden Farm property. | ||||||||||||||||||||||||||
d Of this amount, $691,387 shall be from exempt institutional sources and is shown here for informational purposes only. Therefore, this amount shall not be accounted for in the State's Capital Construction Fund and the limitations on encumbrance timeliness and use of internal workforce do not apply. The remaining $414,773 shall be from the Lottery proceeds received by the Division of Parks and Outdoor Recreation in the Department of Natural Resources. | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
(6) FORT LEWIS COLLEGE | ||||||||||||||||||||||||||
(A) Controlled Maintenance Projects | ||||||||||||||||||||||||||
Replace Deteriorated Bleachers, Gymnasium | 175,875 | |||||||||||||||||||||||||
510,234 | ||||||||||||||||||||||||||
Repair/Replace Campus Master Fire Alarm System, Phase 1 | 96,325 | |||||||||||||||||||||||||
782,434 | 782,434 | |||||||||||||||||||||||||
a This amount shall be from gifts and donations. | ||||||||||||||||||||||||||
TOTALS PART V | ||||||||||||||||||||||||||
(HIGHER EDUCATION) | $115,684,404 |
$10,918,383 | $34,010,490 | |||||||||||||||||||||||
$162,113,277 | $1,500,000 | |||||||||||||||||||||||||
PART IX | ||||||||||||||||||||||||||
DEPARTMENT OF NATURAL RESOURCES | ||||||||||||||||||||||||||
(2) DIVISION OF WILDLIFE | ||||||||||||||||||||||||||
(A) Capital Construction and Controlled Maintenance Projects | ||||||||||||||||||||||||||
Dam Maintenance Repair and Improvement | 159,500 | 159,500 | a |
|||||||||||||||||||||||
Land Acquisitions | 2,500,000 | 2,500,000 | a |
|||||||||||||||||||||||
Fish Unit Maintenance and Improvement | 1,490,686 | 1,490,686 | a |
|||||||||||||||||||||||
Property Maintenance, Improvement and Development | 1,541,901 | 1,541,901 | a |
|||||||||||||||||||||||
Watchable Wildlife in State Parks | 250,000 | 250,000 | a |
|||||||||||||||||||||||
Waterfowl Habitat Projects | 160,000 | |||||||||||||||||||||||||
160,000 | b |
|||||||||||||||||||||||||
Motorboat Access on Lakes and Streams | 867,000 | 217,000 | a |
650,000 | ||||||||||||||||||||||
Stream and Lake Improvements | 659,007 | 659,007 | a |
|||||||||||||||||||||||
Employee Housing Repairs | 239,710 | 239,710 | a |
|||||||||||||||||||||||
Cooperative Habitat Development | 400,000 | 400,000 | a |
|||||||||||||||||||||||
Integrated Telephone System | 500,000 | 500,000 | a |
|||||||||||||||||||||||
Colorado Wetlands Initiative | 250,000 | 250,000 | a |
|||||||||||||||||||||||
Buena Vista Water Collection System | 750,000 | 750,000 | a |
|||||||||||||||||||||||
Whirling Disease Positive Hatchery Improvements | 7,941,176 | 7,941,176 | a |
|||||||||||||||||||||||
Miscellaneous Small Projects | 562,610 | 562,610 | a |
|||||||||||||||||||||||
18,271,590 | ||||||||||||||||||||||||||
a These amounts shall be from reserves in the Wildlife Cash Fund. | ||||||||||||||||||||||||||
b This amount shall be from the Duck Stamp Program. | ||||||||||||||||||||||||||
TOTALS PART IX | ||||||||||||||||||||||||||
(NATURAL RESOURCES) | $27,971,590 | $27,321,590 | $650,000 | |||||||||||||||||||||||
PART XI | ||||||||||||||||||||||||||
DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT | ||||||||||||||||||||||||||
(1) CAPITAL CONSTRUCTION PROJECTS | ||||||||||||||||||||||||||
Water Quality Wastewater Treatment Construction Grants | 3,000,000 | 3,000,000 | ||||||||||||||||||||||||
Laboratory Equipment Upgrade | 566,000 | 500,000 | 66,000 | a |
||||||||||||||||||||||
Replacement of Air Quality Monitoring Station | ||||||||||||||||||||||||||
240,724 | 240,724 | b |
||||||||||||||||||||||||
3,806,724 | ||||||||||||||||||||||||||
a This amount shall be from the Newborn Screening and Genetic Counseling Fund. | ||||||||||||||||||||||||||
b This amount shall be from the Automobile Inspection and Readjustment Account of the Highway Users Tax Fund. | ||||||||||||||||||||||||||
TOTALS PART XI | ||||||||||||||||||||||||||
(PUBLIC HEALTH AND ENVIRONMENT) | $3,500,000 | |||||||||||||||||||||||||
$3,806,724 | $306,724 | |||||||||||||||||||||||||
PART XII | ||||||||||||||||||||||||||
DEPARTMENT OF PUBLIC SAFETY | ||||||||||||||||||||||||||
(1) CAPITAL CONSTRUCTION PROJECTS | ||||||||||||||||||||||||||
Laboratory Renovation, 690 Kipling Street, Phase 1 | 294,785 | 239,052 | 55,733 | b |
||||||||||||||||||||||
Computeraided Dispatch System, Colorado State Patrol, Phase 27 | 2,000,000 | 2,000,000 | ||||||||||||||||||||||||
Engine Replacement, King Air Aircraft | 220,000 | 220,000 | a |
|||||||||||||||||||||||
Communication System Maintenance, Colorado State Patrol, Phase 2 | 437,000 | 437,000 | ||||||||||||||||||||||||
Replacement of Colorado Crime Information Center Network, Colorado Bureau of Investigation, Phase 1 | 1,337,398 | 1,337,398 | ||||||||||||||||||||||||
Replacement Facility, Fort Collins Troop Office | ||||||||||||||||||||||||||
1,126,967 | 899,087 | 227,880 | c | |||||||||||||||||||||||
Additions and Renovations to Troop Offices | 50,050 | 50,050 | ||||||||||||||||||||||||
5,466,200 | ||||||||||||||||||||||||||
a Of this amount, $100,000 shall be from reserves in the Public Safety Internal Service Fund and $120,000 shall be from reserves in the Sale of Vehicles Fund. | ||||||||||||||||||||||||||
b This amount shall be from reserves in the Contraband Custodial Fund. | ||||||||||||||||||||||||||
c Of this amount, $150,000(T) shall be from the Department of Transportation's Construction, Maintenance, and Operations Budget, and $77,880 shall be from the sale of property. | ||||||||||||||||||||||||||
TOTALS PART XII | ||||||||||||||||||||||||||
(PUBLIC SAFETY) | ||||||||||||||||||||||||||
$5,466,200 | $4,962,587 | $503,613 | ||||||||||||||||||||||||
GRAND TOTALS | ||||||||||||||||||||||||||
(CAPITAL CONSTRUCTION) | $37,986,806 | |||||||||||||||||||||||||
$283,217,505 | $169,262,604 |
$65,437,604 | a | $10,530,491 | ||||||||||||||||||||||
a Of this amount, |
SECTION 7. Part
II (2), Part IV (1), Part V (6)(B), (10)(B), (11)(B), (13)(B),
(14)(B), (18)(A), and (31)(A), Part VI (1)(B), Part XIII (2),
Part XIV (1), footnote 4, and the affected totals of section 3
of chapter 336, Session Laws of Colorado 1998, are amended, and
the said Part VI is further amended BY THE ADDITION OF A NEW SECTION
(5) and the said section 3 is further amended BY THE ADDITION
OF A NEW FOOTNOTE, to read:
Section 3. Capital construction appropriation.
PART II | ||||||||||||||||||||||||||
DEPARTMENT OF CORRECTIONS | ||||||||||||||||||||||||||
(2) CAPITAL CONSTRUCTION PROJECTS | ||||||||||||||||||||||||||
Sterling Correctional Facility, Phase 3 of 3 | 62,520,145 | |||||||||||||||||||||||||
64,135,688 | 1,615,543 | a |
||||||||||||||||||||||||
Trinidad Correctional Facility, Phase 2 Planning | 2,529,100 | 2,529,100 | ||||||||||||||||||||||||
Denver Women's Correctional Facility, Phase 3 | 67,065,770 | 65,865,770 | 1,200,000 | b | ||||||||||||||||||||||
Miscellaneous Small Projects, Correctional Industries1 | 100,000 | 100,000 | c |
|||||||||||||||||||||||
Arkansas Valley Correctional Facility, HVAC Retrofit, Phase 1 of 3 | 4,614,140 | 4,614,140 | ||||||||||||||||||||||||
Colorado Women's Correctional Facility, Life Safety, Inmate Duress System, Living Units 1, 2, 3, and 4 | 94,659 | 94,659 | ||||||||||||||||||||||||
Arkansas Valley Correctional Facility, Life Safety, Sewage Life Station Improvements | 68,369 | 68,369 | ||||||||||||||||||||||||
East Canon City Prison Complex Visitor Processing Center Expansion | 402,017 | 402,017 | b |
|||||||||||||||||||||||
139,009,743 | ||||||||||||||||||||||||||
a | ||||||||||||||||||||||||||
b These amounts shall be from sales revenues of the Canteen Operation. | ||||||||||||||||||||||||||
c This amount shall be from sales revenues earned by Correctional Industries. | ||||||||||||||||||||||||||
TOTALS PART II | ||||||||||||||||||||||||||
(CORRECTIONS) | $139,372,989 |
$1,602,017 | ||||||||||||||||||||||||
$142,690,549 | $1,715,543 | |||||||||||||||||||||||||
(1) CAPITAL CONSTRUCTION PROJECT | ||||||||||||||||||||||||||
Colorado Benefits Management System, Phase 3 | ||||||||||||||||||||||||||
3,850,879 | 1,583,079 | 51,308 | a | 2,216,492 | ||||||||||||||||||||||
a This amount shall be from the Old Age Pension Fund. | ||||||||||||||||||||||||||
TOTALS PART IV | ||||||||||||||||||||||||||
(HEALTH CARE POLICY AND FINANCING) | ||||||||||||||||||||||||||
$3,850,879 | $1,583,079 | $51,308 | $2,216,492 | |||||||||||||||||||||||
(6) COLORADO STATE UNIVERSITY | ||||||||||||||||||||||||||
(B) Capital Construction Projects | ||||||||||||||||||||||||||
Expansion and Renovation, Engineering Building, Phase 3 of 3 | 10,035,458 | 7,035,458 | ||||||||||||||||||||||||
3,000,000 | b |
|||||||||||||||||||||||||
Colorado State Forest Service District Office Replacement at Durango and Boulder | 787,361 | 787,361 | ||||||||||||||||||||||||
Old Fort Collins High School, Purchase and Renovation, Phase 2 of 3 | 575,951 | 575,951 | ||||||||||||||||||||||||
Exercise and Sports Science Clinical/Research Laboratory | 1,116,931 | 1,116,931 | a |
|||||||||||||||||||||||
Student Recreation Center Addition | 3,360,000 | 3,360,000 | a |
|||||||||||||||||||||||
Housing Materials and Furnishings Storage Facility | 1,653,040 | 1,653,040 | a |
|||||||||||||||||||||||
Animal Sciences Program, Farm Relocation, Phase 2 of 3 | 4,688,621 | 4,688,621 | ||||||||||||||||||||||||
22,217,362 | ||||||||||||||||||||||||||
27,251,934 | ||||||||||||||||||||||||||
a These amounts shall come from exempt institutional sources and are shown here for informational purposes only. Therefore, they shall not be accounted for in the State's Capital Construction Fund and the limitations on encumbrance timeliness and use of internal workforce do not apply. | ||||||||||||||||||||||||||
b This amount shall be from Exempt Institutional Sources. | ||||||||||||||||||||||||||
(10) UNIVERSITY OF COLORADO AT BOULDER | ||||||||||||||||||||||||||
(B) Capital Construction Projects | ||||||||||||||||||||||||||
Environmental Health and Safety Center3 | ||||||||||||||||||||||||||
3,648,624 | 3,648,624 | a |
||||||||||||||||||||||||
Ekeley Science Building East Wing Renovation | 2,104,351 | |||||||||||||||||||||||||
2,481,460 | 377,109 | c |
||||||||||||||||||||||||
Humanities/Social Sciences Building Construction, Including Renovation of Woodbury Arts and Sciences Building, Phase 3 of 3 | 3,929,248 | |||||||||||||||||||||||||
5,129,248 | 1,200,000 | c |
||||||||||||||||||||||||
Porter Biosciences Renovation, Phase 2 of 4 | 1,605,852 | 1,605,852 | ||||||||||||||||||||||||
Geology Building Renovation | 6,012,478 | 3,869,682 | ||||||||||||||||||||||||
2,142,796 | c |
|||||||||||||||||||||||||
Interdisciplinary Environmental Engineering Addition and Renovation | 2,131,418 | 2,131,418 | ||||||||||||||||||||||||
Renovation of Research Lab #33 | 5,621,000 | 5,621,000 | a |
|||||||||||||||||||||||
Air Supported Practice Facility | 1,500,000 | 1,500,000 | a |
|||||||||||||||||||||||
Renovation of Imig Music Practice Rooms | 497,000 | 497,000 | b |
|||||||||||||||||||||||
Institute of Behavioral Genetics Addition | 496,000 | 496,000 | a |
|||||||||||||||||||||||
29,123,080 | ||||||||||||||||||||||||||
34,130,208 | ||||||||||||||||||||||||||
a These amounts shall come from exempt institutional sources and are shown here for informational purposes only. Therefore, they shall not be accounted for in the State's Capital Construction Fund and the limitations on encumbrance timeliness and use of internal workforce do not apply. | ||||||||||||||||||||||||||
b This amount shall come from student fees and is shown here for informational purposes only. Therefore, it shall not be accounted for in the State's Capital Construction Fund and the limitations on encumbrance timeliness and use of internal workforce do not apply. | ||||||||||||||||||||||||||
c These amounts shall come from Exempt Institutional Sources. | ||||||||||||||||||||||||||
(11) UNIVERSITY OF COLORADO AT COLORADO SPRINGS | ||||||||||||||||||||||||||
(B) Capital Construction Projects | ||||||||||||||||||||||||||
Library Remodeling and Information Technology and Communication Center Expansion, Phase 2 of 4 | 8,470,935 | |||||||||||||||||||||||||
11,937,765 | 3,466,830 | b |
||||||||||||||||||||||||
Land Acquisition, North Nevada Avenue | 1,780,000 | 1,780,000 | a |
|||||||||||||||||||||||
13,717,765 | ||||||||||||||||||||||||||
14,063,765 | ||||||||||||||||||||||||||
b This amount shall be from Exempt Institutional Sources. | ||||||||||||||||||||||||||
(13) UNIVERSITY OF COLORADO HEALTH SCIENCES CENTER | ||||||||||||||||||||||||||
(B) Capital Construction Projects | ||||||||||||||||||||||||||
Consolidation of Cancer and Urology Programs at Fitzsimons, Phase 4 of 4 | ||||||||||||||||||||||||||
18,125,000 | 18,125,000 | b |
||||||||||||||||||||||||
Building 500 and Other Building Renovations at Fitzsimons, Phase 1 of 33 | 8,750,000 | 8,750,000 | a |
|||||||||||||||||||||||
Infrastructure Development at Fitzsimons | 4,000,000 | 2,000,000 | ||||||||||||||||||||||||
2,000,000 | b |
|||||||||||||||||||||||||
Education Space Remodel at 9th and Colorado3 | 4,643,280 | 4,643,280 | a |
|||||||||||||||||||||||
Research Space Renovations at 9th and Colorado3 | 3,240,000 | 3,240,000 | a |
|||||||||||||||||||||||
TeleEducation Health System | 2,158,992 | 2,158,992 | ||||||||||||||||||||||||
Denison Library Renovation | 2,009,090 | 2,009,090 | ||||||||||||||||||||||||
42,926,362 | ||||||||||||||||||||||||||
45,380,801 | ||||||||||||||||||||||||||
a These amounts shall be from exempt institutional sources and are shown here for informational purposes only. Therefore, they shall not be accounted for in the State's Capital Construction Fund and the limitations on encumbrance timeliness and use of internal workforce do not apply. | ||||||||||||||||||||||||||
b These amounts shall be from Exempt Institutional Sources. | ||||||||||||||||||||||||||
(14) COLORADO SCHOOL OF MINES | ||||||||||||||||||||||||||
(B) Capital Construction Projects | ||||||||||||||||||||||||||
Hill Hall Renovation and Addition, Phase 4 of 4 | 2,434,392 | 2,434,392 | ||||||||||||||||||||||||
Center for Technology and Learning Media for Engineers and Scientists, Phase 1 of 2 | 1,171,246 | 1,155,346 | ||||||||||||||||||||||||
15,900 | b |
|||||||||||||||||||||||||
Blaster Village Residence Facility | 5,581,858 | 5,581,858 | a |
|||||||||||||||||||||||
9,187,496 | ||||||||||||||||||||||||||
10,999,007 | ||||||||||||||||||||||||||
a | ||||||||||||||||||||||||||
b This amount shall be from Exempt Institutional Sources. | ||||||||||||||||||||||||||
(18) COMMUNITY COLLEGE OF AURORA | ||||||||||||||||||||||||||
(A) Capital Construction Projects | ||||||||||||||||||||||||||
Student Center/Learning Resource Center, Aurora CentreTech Campus, Phase 2 of 2 | 1,649,321 | |||||||||||||||||||||||||
3,438,580 | 1,789,259 | a |
||||||||||||||||||||||||
Forum Building Addition and Renovation, Phase 1 of 2 | 156,468 | 156,468 | ||||||||||||||||||||||||
Technology Upgrade | 643,738 | 643,738 | ||||||||||||||||||||||||
4,238,786 | ||||||||||||||||||||||||||
a These funds shall be from auxiliary enterprise funds. | ||||||||||||||||||||||||||
(31) COLORADO ADVANCED TECHNOLOGY INSTITUTE | ||||||||||||||||||||||||||
(A) Capital Construction Project | ||||||||||||||||||||||||||
Colorado Advanced Photonics Technology Center, Lowry Higher Education Center, Phase 24 | 2,811,000 | 2,811,000 | ||||||||||||||||||||||||
TOTALS PART V | ||||||||||||||||||||||||||
(HIGHER EDUCATION) | $167,055,987 |
$17,884,862 | $3,000,000 | |||||||||||||||||||||||
$300,995,901 | $113,055,052 | |||||||||||||||||||||||||
(1) EXECUTIVE DIRECTOR'S OFFICE | ||||||||||||||||||||||||||
(B) Capital Construction Project | ||||||||||||||||||||||||||
Colorado Benefits Management System, Phase 3 of 5 | 11,094,438 | |||||||||||||||||||||||||
1,741,273 | 890,329 | a | 3,850,879 | b | 4,611,957 | |||||||||||||||||||||
11,494,438 | ||||||||||||||||||||||||||
a This amount shall be from the Old Age Pension Fund. | ||||||||||||||||||||||||||
b This amount shall be from Medicaid funds provided by the Department of Health Care Policy and Financing. | ||||||||||||||||||||||||||
(5) DIRECT SERVICES | ||||||||||||||||||||||||||
Mental Health Institutes | ||||||||||||||||||||||||||
(A) Capital Construction Projects | ||||||||||||||||||||||||||
Mental Health Institute at Pueblo, Building 20 Forensics Remodeling | 238,100 | 238,100 | ||||||||||||||||||||||||
Mental Health Institute at Fort Logan, Substance Abuse Admissions Unit 4b | 272,400 | 272,400 | a |
|||||||||||||||||||||||
510,500 | ||||||||||||||||||||||||||
a This amount shall be from revenues received from Mental Health Community Capitation. | ||||||||||||||||||||||||||
TOTALS PART VI | ||||||||||||||||||||||||||
(HUMAN SERVICES) | ||||||||||||||||||||||||||
$66,085,276 | $56,459,711 | $1,162,729 | $3,850,879 | $4,611,957 | ||||||||||||||||||||||
(2) CAPITAL CONSTRUCTION PROJECTS | ||||||||||||||||||||||||||
Renovate Building 105, Camp George West5 | 1,296,760 | 1,296,760 | ||||||||||||||||||||||||
Computeraided Dispatch System, Colorado State Patrol, Phase 3 of 36 | 2,044,220 | 2,044,220 | ||||||||||||||||||||||||
Replacement of Colorado Crime Information Center Network, Colorado Bureau of Investigation, Phase 2 of 3 | 1,283,912 | 1,283,912 | ||||||||||||||||||||||||
Aircraft Replacement Program, Replacement of Baron Aircraft | 72,116 | a | ||||||||||||||||||||||||
507,016 | 434,900 | |||||||||||||||||||||||||
Communications System Maintenance and Expansion, Phase 3 of 5 | 452,884 | 452,884 | b |
|||||||||||||||||||||||
Grand Junction Troop Office Construction | 754,497 | 233,299 | 521,198 | b |
||||||||||||||||||||||
6,339,289 | ||||||||||||||||||||||||||
a This amount shall be from the sale of the existing aircraft and the Internal Services Fund Aircraft Reserve. | ||||||||||||||||||||||||||
b These amounts shall be from the Highway Users Tax Fund pursuant to Section 434201 (3)(a), C.R.S. | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
TOTALS PART XIII | ||||||||||||||||||||||||||
(PUBLIC SAFETY) | $1,046,198 | |||||||||||||||||||||||||
$6,466,831 | $5,420,633 | |||||||||||||||||||||||||
(1) CAPITAL CONSTRUCTION PROJECTS | ||||||||||||||||||||||||||
Fort Morgan Building Replacement | ||||||||||||||||||||||||||
253,943 | 253,943 | |||||||||||||||||||||||||
New Building, Phase 1 | 4,500,000 | 4,500,000 | ||||||||||||||||||||||||
Loma Port of Entry Asphalt Repair | 433,981 | 317,770 | 116,211 | a |
||||||||||||||||||||||
Reengineering Project, Motor Carrier Services Division, Phase 2 of 5 | 1,044,855 | 1,044,855 | a |
|||||||||||||||||||||||
6,232,779 | ||||||||||||||||||||||||||
a These amounts shall be from the Highway Users Tax Fund pursuant to Section 434201 (3)(a), C.R.S. | ||||||||||||||||||||||||||
| ||||||||||||||||||||||||||
TOTALS PART XIV | ||||||||||||||||||||||||||
(REVENUE) |
$1,161,066 | |||||||||||||||||||||||||
$6,232,779 | $5,071,713 | |||||||||||||||||||||||||
GRAND TOTALS | ||||||||||||||||||||||||||
(CAPITAL CONSTRUCTION) | ||||||||||||||||||||||||||
$619,512,571 | $402,797,822 |
$46,270,916 | $158,973,038 | a |
$11,470,795 | |||||||||||||||||||||
a Of this amount, $1,600,486 contains a (T) notation and $2,135,148 is from the Highway Users Tax Fund pursuant to Section 434201(3)(a), C.R.S. |
FOOTNOTES
4 Capital Construction, Department of Higher Education,
Colorado Advanced Technology Institute, Colorado Advanced Photonics
Technology Center, Lowry Higher Education Center, Phase 2
It is the intent of the General Assembly that the first $2,811,000
of all proceeds received by CATI from the sale of Supernet shall
be APPROPRIATED AS OPERATING FUNDS FOR CATI. ANY REMAINING FUNDS
RECEIVED BY CATI FROM THE SALE OF SUPERNET SHALL BE credited to
the Capital Construction Fund as reimbursement for the state's
contribution for Phase 2 of the Advanced Photonics Technology
project. THIS REIMBURSEMENT CAN BE FROM FUNDS RECEIVED IN EITHER
FY 199899 OR FY 199900.
4b CAPITAL CONSTRUCTION, DEPARTMENT OF HUMAN SERVICES, DIRECT SERVICES, MENTAL HEALTH INSTITUTES, CAPITAL CONSTRUCTION PROJECTS, MENTAL HEALTH INSTITUTE AT FORT LOGAN, SUBSTANCE ABUSE ADMISSIONS UNIT IT IS THE INTENT OF THE GENERAL ASSEMBLY THAT NO ADDITIONAL FTE SHALL BE REQUESTED BY OR PROVIDED TO THE DEPARTMENT OF HUMAN SERVICES AS A RESULT OF THIS CAPITAL CONSTRUCTION PROJECT.
SECTION 8. Safety
clause. The general assembly hereby finds, determines, and
declares that this act is necessary for the immediate preservation
of the public peace, health, and safety.
____________________________ ____________________________
Ray Powers Russell George
PRESIDENT OF SPEAKER OF THE HOUSE
THE SENATE OF REPRESENTATIVES
____________________________ ____________________________
Patricia K. Dicks Judith M. Rodrigue
SECRETARY OF CHIEF CLERK OF THE HOUSE
THE SENATE OF REPRESENTATIVES
APPROVED________________________________________
_________________________________________
Bill Owens
GOVERNOR OF THE STATE
OF COLORADO